Arlington Heights & the northwest suburbsCall (224) 524-1410

A village around its lake

Asphalt Paving in Lake Zurich, IL

Lakeside homes and subdivisions that grew from the 1950s on.

  • Estimates on site, at no cost
  • Village permit paperwork prepared with your quote
  • Thickness, base and scope itemized line by line

Homes Around a Lake

Asphalt paving in Lake Zurich works around a village built around water. The lake, originally called Cedar Lake, lies entirely inside the village, and about 0.4 of the village's 7.3 square miles is water. Lake Zurich incorporated on September 29, 1896, began seeing housing development in the 1950s, and grew from 850 residents in 1950 to 14,947 in 1990 and 19,759 in 2020.

Lakeside lots

Homes near the lake can sit on lower, wetter ground. Wet bases weaken during spring thaw, and driveways there are more likely to heave or settle. We add stone where the ground stays soft and set grades so water drains away from the house.

Older roads

U.S. 12 arrived in 1922 and Illinois 22 in 1927, so some of the village's older properties front busier roads. Approaches onto state highways may need IDOT approval.

Subdivision driveways

Newer subdivisions have driveways in their maintenance years. Crack sealing in the fall and a sealcoat every few years keep them in good shape.

Commercial lots

Businesses along Rand Road and Route 22 need regular crack sealing, patching, sealcoating and striping.

Elevation and slopes

Lake Zurich sits at about 886 feet, among the higher towns in the area. Where a driveway slopes, runoff moves faster. We compact firmly, shape edges to resist erosion and make sure water does not run straight into the garage or onto a neighbor's lot.

Older 1950s-era driveways

Housing development began in the 1950s, so the oldest driveways in the village are now around seventy years old. Those usually need replacement; widening, where wanted, has to fit village rules.

Housing count

The 2020 census counted 7,262 housing units with a 2.7 percent vacancy rate. Most driveways are in use year-round and see steady wear.

Sealing schedule

Lakeside humidity and morning dew slow sealer curing. We schedule sealcoating for warm, dry, sunny stretches.

Rand Road and Route 22

Businesses along U.S. 12 (Rand Road) and Illinois 22 have lots that see steady traffic. Entrances on these state routes may need IDOT approval for changes. We maintain those lots with patching, sealing and striping in phases.

Subdivisions since the 1990s

The village grew by nearly 5,000 residents between 1990 and 2020. Newer driveways there are in their maintenance years.

Free estimates

After a visit to look at the base and the drainage, you get an itemized estimate in writing. Call (224) 524-1410 or

Get a Free Estimate

.

Lake Zurich at a Glance

  • Lake inside the village. The lake, originally called Cedar Lake, lies entirely within the village; about 0.41 of its 7.33 square miles is water.
  • Growth. Lake Zurich incorporated on September 29, 1896; housing development began in the 1950s, and the population grew from 850 in 1950 to 19,759 in 2020.
  • Highways. U.S. 12 reached the village in 1922 and Illinois 22 in 1927.
Asphalt Resurfacing in Arlington Heights, IL

Lake Zurich Questions

Our lakeside driveway heaves in winter. Why?

Wet ground freezes and lifts pavement. A deeper stone base and better drainage help.

Does a driveway on Route 22 need state approval?

Approaches on state highways may need IDOT approval. We check.

How often should I sealcoat?

Every two to three years, when the surface fades.

Do you serve newer subdivisions?

Yes.

Our driveway slopes toward the lake. Is that a problem?

Runoff should be directed so it soaks into lawn or a swale rather than running across the driveway and straight to the shore. We plan for that.

Can you widen an older lake-house driveway?

Often, within village rules. We check setbacks and coverage first.

Do you work on Rand Road business lots?

Yes, with phased schedules.

What does a new driveway cost in Lake Zurich?

HomeGuide's national range for a standard asphalt driveway is roughly $5 to $12-plus per square foot. Wet lots needing extra base cost more. Your written estimate is the price.

Do I need a permit?

Driveway work generally needs village review. We confirm before scheduling.

When is the best time to crack seal?

From August into autumn, ahead of the first hard freeze.

Free Estimates in Lake Zurich, IL

Free estimates in Lake Zurich.

Call Now: (224) 524-1410